A good working environment can not only bring workers a good working mood, but also improve the efficiency of the machine. Do you know how to deal with the sewage and garbage produced on the site? According to the site conditions, reasonably set up the wastewater sedimentation tank and car wash tank, layout the drainage system, set up obvious signs: set up a reasonable tertiary filter tank for sewage discharge.
Wastewater Treatment
- The sewage discharge scheme shall be planned and designed and submitted to the supervision engineer for approval.
- Sewage treatment set up multi-stage sedimentation tank, through precipitation filtration, to reach the discharge standard.
- The toilet sewage enters the septic tank through centralized independent pipes and is closed for treatment.
Garbage disposal
- A large garbage accumulation pool is set up in the living area and the office production area to store all kinds of garbage in a centralized manner.
- The waste treatment pond is generally built of brick and its volume shall not be less than 4mX3mX 1.5m, and Inform local sanitation department regularly to dispose of garbage.
- The ground should be regularly sprayed with water to cover the dust source.
- After each concrete mixing operation is completed, clean the equipment in time, clean up the site, and keep the site tidy.
- The noise generated by construction in adjacent residential areas should not be greater than the current "Noise Limits for Building Construction Sites" (GB12523), otherwise monitoring should be carried out.
- Motor vehicles, equipment flushing facilities, drainage ditches and sedimentation tanks should be set up as required, and the construction sewage can be discharged into the municipal sewage pipe network or rivers after reaching the standard.
- Wastewater, waste oil and domestic sewage generated by construction machinery and equipment shall not be directly discharged into rivers, lakes or other waters, nor into the land near drinking water.
- When feeding materials such as cement and fly ash, pay attention to the sealing performance of the top of the material tank. When the dust is large, the feeding should be temporarily stopped, and it can be continued after processing.
- Regularly and specially-assigned persons should clean and clean the mixing station to keep the mixing station hygienic.